Data Center Dispatch Published by AKCP
Section

Author: <span>Nicholas Barrowclough</span>

Total Power Usage Effectiveness: What PUE Misses on AI Racks

Total power usage effectiveness (TUE = ITUE x PUE) counts power lost inside IT equipment that standard PUE ignores. AI racks lose measurable power to fans, power supplies, and voltage regulator modules before it reaches the GPU die. Calculating TUE…

Data Center UPS Failure: What Happens in the First Five Minutes

Summary: Published guidance on data center UPS failure usually stops at prevention of failures. Test batteries, maintain transfer switches, monitor warning signs. But what happens after a failure, when someone must decide what stays on and what gets cut before…

Data Center Water Leakage: Detection Is Reaching the Rack

Data center water leakage programs were built around raised-floor piping and CRAH units, not the cooling loop running through the rack. Direct liquid cooling and CDUs put leak points inside the rack, past where under-floor rope sensors are positioned to…

What Is the Right Server Room Temperature Range?

ASHRAE’s recommended envelope, 18 to 27 degrees Celsius, applies at the equipment air intake, not the room average. Allowable ranges widen from Class A1 to A4, so the ‘right’ upper limit depends on what hardware the room runs. Most facilities…

Riot Platforms Weighs $16.1 Billion AI Data Center Deal

Riot Platforms is reportedly evaluating a potential AI data center transaction valued at $16.1 billion. The deal, as described, targets up to $8.2 billion of net operating income. The report signals continued momentum for Bitcoin miners repositioning as AI and…

Northern Virginia Dropped 3.8 GW Again, Two Years After NERC Said Why

PJM is weighing reliability requirements for data centers after nearly 3,800 MW of Northern Virginia demand transferred to onsite generation during a grid disturbance, the second event of its kind in two years. The July disturbance began with a mechanical…

Bitdeer Secures $4.7 Billion AI Data Centre Lease in Norway

Bitdeer has secured a $4.7 billion AI data centre lease in Norway, according to Indiatimes. The deal adds large-scale AI compute capacity to Bitdeer’s Nordic footprint. Indiatimes did not disclose the site, capacity, or lease term in its report. Bitdeer…

PPL Electric Reports 31.8 GW in AI Data Center Demand Pipeline

PPL Electric’s AI data center demand pipeline now totals 31.8 GW, with 11 GW under signed agreements. A PPL-Blackstone joint venture has secured sites in Pennsylvania to build up to 14 GW of new generation. The figures point to sustained,…